Knit management. How to knit a large model ready. To knit a big deal for a certain period of time, I am using such methodology. Methodology 1 to 8 1. I note the deadlines of execution of work.
Example: you must knit the man Turtleneck Sweater from the 14.11 up to the 24th of December, so in 38 days. 2. I smash the work on the product on stage. Example: To the men Turtleneck Sweater to knit one must – rear part of the stocking, knit front piece, knit 2 sleeves -, the Assembly of the Rollkragenpullovers + steam – neck knit. In addition, you must take into account the time for Assembly and the possible changes of the final details.
3. I choose the portion of the time that is needed for working on every detail of the product, as a percentage. The entire work with the Turtleneck 100% of the time. (According to the type of the pattern of shapes is to swing the ratio, that are used for the knitting of the individual parts of the product.) Example: for the assembling and I choose 8 days of any changes. Now I take off by 38 days 8 days, and I assume the received 30 days for 100%. Then, I share the time according to the defined stages – example 2. The front (the complicated pattern) 40% of the time, rear end (without complicated pattern)-30%, the sleeve every 15%. 4. I choose the number of days required for the individual parts. 30 Days 100%, then 1-front 40%-12 days + the 2 back 30%-9 days + the 3-1 Sleeve 15% – 4.5 days + the 4-2 Sleeve 15% 4.5 days + 5 installation, changes-8 days. 5. Learn more at this site: Glenn Dubin, New York City. I choose the density of knitting in the ranks. (How much series 10 cm are in). …Weiter on LiAnDri handmade.